End-to-end China sourcing

Master China Sourcing with Confidence

Sourcing Made Easy. We handle your entire China supply chain end-to-end—from factory vetting to doorstep delivery, so you can focus on growing your brand.

600+

Vetted factories

18

QC engineers in China

32

Countries delivered

Why brands trust us

A sourcing partner that answers for the whole order.

On-the-Ground Presence

Our own teams in Shenzhen, Ningbo and Yiwu walk the factory floor, so nothing is left to a screen or a middleman.

Zero Hidden Fees

One transparent service fee. You see original factory invoices, freight costs and every line item we pay on your behalf.

Strict Quality Assurance

AQL inspections at pre-production, in-line and pre-shipment stages, with photo and video reports before payment clears.

End-to-end services

How We Take Your Product From Concept to Delivery

One accountable team across sourcing, quality and freight — no handoffs, no finger pointing, no surprise invoices at the port.

Supplier Vetting & Negotiation

Verified audits, capability checks and hard-nosed price negotiation on your behalf.

Sample Production & Customization

Golden samples, packaging design and OEM tooling managed until you sign off.

Production Oversight

Weekly line updates and in-process inspections that keep schedules honest.

Lab Testing & Compliance

CE, FCC, REACH, CPSIA and FDA testing arranged with accredited labs.

Global Logistics & Customs

Consolidation, freight booking, customs clearance and final-mile delivery.

Documentation & IP Cover

Contracts, NNN agreements and export paperwork prepared in both languages.

How it works

Five steps from inquiry to doorstep.

  1. Submit Inquiry

    Share specs, target price and volumes. We reply within 24 hours.

  2. Factory Matching

    Three vetted quotes with audit notes and honest trade-offs.

  3. Sample & Approval

    Samples shipped to you, revised until the golden sample is signed.

  4. Production & QC

    Line monitoring plus AQL inspections with full photo reporting.

  5. Shipping & Delivery

    Freight, customs and delivery to your warehouse or 3PL.

Proof, not promises

Case Studies & Client Success

Real programmes we run today — the problem, what we changed, and the numbers that moved.
E-Commerce

E-Commerce Brand Scaling (DTC Skincare)

Challenge

High defect rates (12%) and high shipping cost driven by oversized packaging.

Solution

Factory audits, packaging optimisation and strict multi-stage QC.

Defects reduced to <0.5%

Logistics cost lowered by 22%

“SinoLink completely transformed our supply chain. Having eyes on the ground in China gave us total peace of mind, and the shipping savings paid for their service within two months.”
Elena R.
Founder & CEO
Retail

Eco-Friendly Product Line Launch (Retail Brand)

Challenge

Difficulty sourcing eco-certified packaging at a workable low MOQ.

Solution

Local sourcing, direct negotiation and hands-on production oversight.

Launched 3 weeks early

100% compliant eco packaging

“As a sustainable brand, material integrity is everything. SinoLink sourced exact eco-certified materials direct from the factory at prices we couldn't have negotiated on our own.”
Marcus T.
Supply Chain Director

From our blog

Latest Insights

Practical guidance from our teams in Shenzhen, Ningbo and Yiwu.

Sourcing guide · 8 min read

A practical guide to supplier verification, quality control, importing and safer product sourcing from China.

Quality control · 6 min read

Compare factory checks, transparent pricing, quality control and logistics support when choosing your sourcing approach.

Ready to Scale Your Supply Chain?

Cut supplier risk, lock in real factory pricing and get one team accountable from the first quote to the final delivery.

FAQ

Answers before you commit.

What are typical MOQ requirements?
Most partner factories start between 500 and 1,000 units, though we regularly negotiate trial runs of 100–300 units for new brands with a clear reorder plan.
Samples take 7–14 days. Mass production typically runs 25–40 days depending on tooling, materials and season, and we publish the schedule before deposit.
We inspect at three points: pre-production material checks, in-line checks at 30–50% output, and a pre-shipment AQL 2.5 inspection with a photo and video report.
Standard terms are 30% deposit and 70% against a passed pre-shipment inspection. Our service fee is invoiced separately and stated up front.
Sea freight runs 28–40 days door to door, rail to Europe 18–25 days, and air 5–8 days. We quote all three so you can balance cost against launch dates.
Yes — OEM tooling, custom colours, logo printing, retail packaging and barcode compliance are all managed in-house with your artwork files.
We use bilingual NNN agreements, split production where sensible, and register your trademark in China before samples go into production.

Free sourcing quote

Start your sourcing journey today

Tell us what you’re making. You’ll get factory-direct pricing, lead times and a clear plan back within 24 hours — no obligation. Contact: hello@sinolink.co | US: +1 805 567 3939 | China: +86 755 2200 1188